The tiler managed to get the screeding done on the main bathroom and laundry today. He has placed a broken tile down on the bedroom floor so I am able to see what it will look like once laid. It is really dark, much darker than I remember or imagined it to be. It has been raining for the past week so it is extremely overcast outside and I am hoping that with more light it won't seem so dark.
The people who installed the bench top had to walk over the screeding and they have left little indentations. Hopefully this won't cause any dramas.
Photos to come.
Showing posts with label bathrooms. Show all posts
Showing posts with label bathrooms. Show all posts
Tuesday, 26 August 2014
Thursday, 20 June 2013
Discontinued carpet and colour changes
One day, out of the blue, I came to the realisation that the tiles in the MIL's bathroom were very similar in pattern and colour to the tiles we chose for our bathroom and ensuite. I wasn't a fan of her bathroom, so I mentioned this to J, who surprisingly agreed with me. We weren't sure though, if we would be able to re-select so many months later, even though our house wouldn't be built for months to come.
So we decided to take a drive over to Di Lorenzo and suss out the situation. We were advised that we would be able to make one change only, which was a relief. We still wanted a large tile for the bathroom walls which limited us in colour and texture. In the end, we both agreed on a gloss white tile. However, we didn't lock in our new selection on the day, we thought we would sit on it for a few days. This turned out to be an excellent decision.
While we were there, we just happened to pop over to the carpet section, and to our surprise found out that our carpet was no longer on display and was believed to be discontinued. Tilly advised that I send her an email and she will follow up and confirm.
Well, instead of looking at this as a negative, we took it as a sign that we had originally made the wrong choices and this was going to allow us to correct them.
The following day I received an email from Tilly advising that our carpet had definitely been discontinued and we would need to come back in and re-select.
This is where our decision to hold off re-selecting our bathroom tiles worked in our best interest.
The other thing that I had been concerned about was our choice of floor tiles. We had selected a ceramic tile, but after talking this out with people at work and having seen the flooring at the display homes, J and I both wished that we had upgraded our tiles to porcelain.
Around the same time, I started questioning our kitchen colours! Back in December we finally found a colour for our Polyurethane Gloss Finish and locked it in with Alex at Kitchen Culture. At our original tiling appointment we opted to remove all tile splashbacks, deciding to have glass splashbacks installed in the kitchen and laundry after handover (a family member worked for a reputable splashback company at the time).
This is what we had in mind for our kitchen.
This is what we had in mind for our kitchen.
This is the colour we chose for the kitchen. It actually looks a lot more like the colour above, but the scan didn't work out too well.
I obviously had too much time on my hands and began questioning all of our earlier decisions. In my opinion, a kitchen like the one above would date too quickly. I wanted something a little more timeless. After googling endless kitchens in various colours, I decided that I wanted a white kitchen. I would still have the red splashback, but white would be a far better choice.
So with all of this in mind at our tiling re-selection, we ended up changing, not only the bathroom wall tiles and carpet, but everything. We chose a brown porcelain floor tile for the entire tiled floor area, chose a white tile for the bathroom & ensuite walls, a new silver and aluminium feature tile and we upgraded our carpets to the Triexta Carpet. We were extremely happy with our selection but not looking forward to receiving the quotation!
Some pics.
Triexta Natural Haven Earth Brown Carpet
Porcelain Tile with Carpet
Porcelain Tile under different light (a little more accurate colour)
New Feature Tile (to run horizontally)
After doing a little research on bathrooms, we decided to include a niche over our bath. This way we avoid all the clutter around the bath.
A word of advice when it comes to the shower or bath niche. Make sure you measure the tallest bottle or item you plan to put in the niche and make your measurements based on this. We opted for 300mm high, tile to tile (not frame to frame).
Labels:
bathrooms,
colour selection,
Di Lorenzo,
Kitchen,
splashbacks
Monday, 12 November 2012
Electrical & tiling appointments
Our second and final day of selections is here.
We weren't too sure what to expect at the electrical appointment and therefore were not fully prepared. We met with Malinda whom was very nice and patient with us. She called our job up on the screen and we proceeded to go through each room and decide where to position each power point, tv socket, light switch etc. We didn't anticipate spending more than a couple of thousand dollars on electrical upgrades, but ended up spending over $5,000! Its amazing how quickly it all adds up.
Some of our upgrades consisted of the following:-
- Switch wire for 7 x fans throughout the house
- Provision for 3 x wall mounted TV's including extra noggins and bull nose wall plates
- Under cupboard light boxes (for kitchen cupboard downlights)
- Double floodlight for backyard
- Double Fluoro light for garage
- 4 x junction boxes (for outdoor lighting to front facade)
- 2 x dimmer switches
- 8 x additional double power points
- 3 x additional single power points
- 1 x additional outdoor power point
- 3 x additional TV points
- 1 x additional motion detector for alarm system
- Additional battens for future pendants over the kitchen island and downlights in a number of the rooms
- Pre-wire for NBN
- TV antenna
- Upgrade alarm to the Navigator package
At the completion of our layout the computer played up and our job was lost. Malinda advised she would do another mock up after we left and email it to me for checking. Of course if this was going to happen, it was going to happen to us.
We left HOG and headed over to Di Lorenzo (after a quick stop for lunch at the Bella Vista Hotel).
At Di Lorenzo Tiles we met with Elisa for our tiling. We believed we were completely organised for this appointment as we had spent countless days and hours at Di Lorenzo contemplating various colour schemes. Admittingly, all the preparation in the world doesn't remove the second guessing that comes with making major decisions.
We decided on a larger wall tile in the standard tile selection for both our ensuite and main bathroom, and standard floor tiles for the bathrooms and main floor area. The only upgrade was our feature bathroom tiles. There were additional costs to lay the larger wall tile but apart from that, we managed to keep the costs down.
We then met with Tilly for carpets. We upgraded our underlay to the blue rubber underlay at $8 per m3. The standard underlay was almost as thin as a sheet of paper. We chose carpet within the standard range as we agreed that we would re-do our carpets in a few years. This appointment was very quick as we had already decided which carpet we wanted prior to this day.
Having finished our colour selections, we were excited to get the land registered and building under way. It was all a waiting game from this point on.
Pics of our tile selections...
Bathroom & Ensuite wall, floor and feature tile
Bathroom floor tile (matt) with mail floor tile (shiny)
Carpet
Monday, 22 October 2012
The fun stuff...
Colours, Kitchen, Landscaping & Plumbing
Today is day 1 of our colour selection process....I have been looking forward to this day since signing our tender. For the past few months I have spent most nights on the internet researching and preparing for this day. Homeone has been an invaluable resource. There are so many helpful and knowledgable people that are happy and willing to share their expertise and experiences with you. I highly recommend this website to anyone whom is building their own home. There is a link to the website on my home page. The exciting part is knowing you have total control over the colour scheme and finishes in your home.
Today is day 1 of our colour selection process....I have been looking forward to this day since signing our tender. For the past few months I have spent most nights on the internet researching and preparing for this day. Homeone has been an invaluable resource. There are so many helpful and knowledgable people that are happy and willing to share their expertise and experiences with you. I highly recommend this website to anyone whom is building their own home. There is a link to the website on my home page. The exciting part is knowing you have total control over the colour scheme and finishes in your home.
Our appointment was booked for 9am and we were on time and filled with enthusiasm and anticipation for the day ahead. Don't get me wrong, I was feeling a little anxious and uncertain that I was 100% prepared and ready to make the right choices.
First up, our colour consultant for the day took us through the exterior colours. Our selections went like this:-
Bricks: Gravel
Roof: Monument (Colorbond)
Gutters, Downpipes, Meter Box & Water Tank: Monument
Fascia: Dune
Garage Door: Dune
Cladding: Dune
Front Door: Dune
Eaves: Surfmist
Windows: APO Grey
Next we moved onto door handles for the doors throughout the house, including the front door, kitchen and bathroom cabinetry handles and WIR door handles. As we had increased the ceiling height to the entrance, we decided to upgrade the main bedroom doors. We also added a solid timber door and lock to our internal garage door (door added at tender stage).
Then it was over to choose paint colours. This was a little difficult. We knew what we wanted, but couldn't find the colour within the limited colour choices provided by EBH. In the end, after much procrastination, we settled on Kidskin for the walls and Crisp White for the skirting and architraves.
The last of the colour choices was the kitchen and bathroom vanities and bench tops. This took us some time as the colours in the brochures were not a true representation of the colour samples at HOG (It could have had something to do with the lighting). With regards to kitchen colours, we were planning upgrading but was advised by our colour consultant to choose a colour for the file and this would be over written once we had our kitchen appointment. So our colour selection was done and dusted.
From here we saw Jenni from Outback Landscaping for our driveway. J and I had come into this appointment determined we would have a cement driveway. But after listening to the pros and cons of each, and the general maintenance of both, we ended up choosing pavers. We chose the Baines Charcoal pavers, laid in a stretcher bond pattern. We opted to upgrade to have the council crossover paved as well. Outback were offering a $2 promotion where they would provide additional concrete/paving to the side of the house. I am not sure of the square meterage but it worked out that we would receive paving to one side of the house, the length of the garage.
Next we were off to meet with Alex from Kitchen Culture. Upon sitting down and sighting our kitchen layout that Alex had printed off, we were surprised to see that there were no overhead cabinets. Who builds a kitchen without overhead cabinets?? Turns out, all project builders don't, and it costs you an arm and a leg to include them! We were a little annoyed because we remember specifically asking our Sales Rep at Homeworld Kellyville whether the overhead cupboards were included and he confirmed that they were. So to be told that they weren't was a bit of a blow.
The kitchen is where you can spend a lot of money on upgrades. For example, here are our upgrades.
- Two sets of soft close pot draws either side of the oven
- Overhead cabinets with a 100mm overhang in lieu of handles
- A lift up door cupboard above the fridge space,
- A light shelf in each overhead cupboard for down lights
- Bulkheads to overhead cabinets, including flyover panel above rangehood
- Laminated panel behind rangehood
- Sharknose detail to base cabinet doors and drawers
- Gloss polyurethane finish to kitchen cabinets, panels, and kickboard.
- Catergory 1 Essastone - Crystal Chalk
- Glass splash back
If anyone wants to know how much any of the above cost, please let me know. I would be happy to share with you.
We also opted to have KC fit out our laundry rather than try and have someone do it after handover.
Here are our kitchen and laundry plans.
3D Kitchen Layout
Laundry Plan
Our appointment with Cooks Plumbing was next. We wanted to keep the costs down seem as we just went overboard at our kitchen appointment. Here is a list of our upgrades.
And some pics.......- Gallery Leonardo Wall-Faced Soft Close Toilet (main & ensuite)
- Caroma Classic 1700 Bath (main)
- Novelli Disc Shower 200mm Square Rose & 300mm Ceiling Dropper
- Dorf Enix Double Towel Rail - 900mm (main & ensuite)
- Everpure Water Filter Std Tap Starter Kit
- Everhard Benchline 45L Flushline Tub (laundry)
Upgraded Shower Head
Upgraded Toilet - Leonardo Wall Faced Soft Close Suite
Standard Basin for Main Bathroom & Ensuite
Standard Mixer for Bathroom & Ensuite
Standard Mixer for Shower
Standard Mixer & Tap for Bath
Standard Towel Rail
Standard Toilet Paper Holder
Standard Shower Head for Main Bathroom
Standard Kitchen Mixer
Standard Kitchen Sink
Standard Laundry Mixer
Standard Laundry Tapware
Upgraded Laundry In-Bench Laundry Tub
Handles for Laundry & Bathroom Cabinets
Sophia Lever Handles (satin chrome)
Upgraded Feature Door to Main Bedroom
Upgraded Gainsborough Oblong Pull Handle for Front Door
Bathroom lights / ceiling fan